Cherry Street Bridge Closed Detour Route 57
                                        On-going from July 2024 thru Fall 2025
Due to construction on the Cherry Street Bridge, the Route 57 is on detour.
The following EASTBOUND bus stops are being BYPASSED:
	- Cherry & Dr. MLK Drive (3056)
 
	- Cherry & Riverwalk Way (3057)
 
Please board at:
	- The bus stop before the detour at Walnut & Dr. MLK Drive (5644)
 
	- Tempory bus stop at Dr. MLK Drive & Vliet (1877)
 
	- The first stop after the detour at Water & Juneau (1424)
 
 
The following WESTBOUND bus stop is being BYPASSED:
	- Cherry & River Center (3055)
 
Please board at:
	- The bus stop before the detour at Water & Juneau (1318)
 
	- Temporary bus stop at Dr. MLK Drive & Vliet (1968)
 
	- Temporary bus stop at Dr. MLK Drive & Cherry (3058)
 
	- The first stop after the detour at Walnut & Dr. MLK Drive (5525)